Произв-во сгущенного молока

Каталог


5T/D Condensed Milk plant quotation list

Standardization Section

No.

Name

Spec

Qty.

Exw RMB

Subtotal

 Technical requirements
101
Plate Heat Exchanger
10 1 9800 9800
Plate Material SUS304, A3 Frame, with Stainless steel coating, Inlet/outlet Φ38
102
Hi-speed Emusifier tank
800L 1 35000 35000
Material: SUS304, with1450RPM high speed agitator in the bottom, agitator motor power 15KW. With PU foaming insulated, close manhole, CIP cleaning ball, adjustable support, digital thermometer.
103
Sanitary Pump
5T/H 1 3200 3200
Material contact part SUS304, centrifugal pump, flow rate 10T/H, lift 24m, motor power 2.2KW, hard alloy mechanical seal, ABB motor
104
Mixing Tank
5000L 1 34000 34000
Material SUS304, single layer vertical storage tank, with manhole, temperature gauge, CIP cleaning ball, paddle agitator, agitator motor 2.2KW
105
Sanitary Pump
5T/H 1 3200 3200
Material contact part SUS304, centrifugal pump, flow rate 10T/H, lift 24m, motor power 2.2KW, hard alloy mechanical seal, ABB motor
106
doul in-line filter
  1 3300 3300
Material SUS304, Strainer 120mesh, inlet/outlet Φ51
107
Operation platform
  1 5600 5600
2000X1000X800 stainless steel support,railing, with checkered stainless steel plate for walkway
108
Return Stroke pump
20T/H 1 9000 9000
Material contact parts SUS304, return stroke pump, suction 6m, motor power 4kw, hard alloy mechanical seal , ABB motor
109
Control Panel
6
6 button
1 3500 3500
Q235 cabinet, schneider electrical element for control cabinet
 
Total
      106600  

Pasteurization & homogenization section
 
No.

Name

Spec
 
Qty.

Exw RMB

Subtotal

 Technical requirements
201
Homogenizer
2T/H 1 58000 58000 25MPa
rated pressure: 25Mpa
202
Coil pasteurizer
2T/H 1 28000 28000
Material SUS304, Coil type pasteurizer, manual operation
203
Control Panel
4 1 3000 3000
Q235 cabinet, schneider electrical element for control cabinet
          89000  

Concentration and crystallation section
 
No.

Name

Spec

Qty.

Exw RMB

Subtotal

 Technical requirements
301
Vacuum concentrator
500 1 69000 69000
Material SUS304, Inner tank vacuum 0.08Mpa, evaporation temperature 60-70, Steam pressure 0.09Mpa, steam consumption 1100kg/h, evaporation capacity 550kg/h, with vacuum system water ring vacuum pump, evaporator inner tank surface mirror finish, outer surface matt finish. in accordance with GMP standard. with 5T/H screw pump.
302
tube cooler
5 1 24000 24000
Material SUS304, with Stainless steel support
303
crystallizing tank
800L 3 44000 132000
Material SUS304, PU foaming for insulated, with manhole, temperature gauge, dimple jacket, spiral agitator, with agitator motor 1.1KW
304
High level storage tank
800L 2 15500 31000
Material SUS304, PU foaming for insulated, with manhole, temperature gauge,CIP cleaning ball, 36RPM paddle agitator, with agitator motor 1.1KW, 
305
rotor pump
5T/H 1 13000 13000
Material contact parts SUS304, stepless speed regulation
306
High level operation platform
  1 15000 15000
 stainless steel support,railing, with checkered stainless steel plate for walkway
307
Control Panel
6 2 3500 7000
Q235 cabinet, schneider electrical element for control cabinet
 
total
      291000  

Filling section
 
No.

Name

Spec
 
Qty.

Exw RMB

Subtotal

 Technical requirements
401
Filling Machine
  1    
Customer prepare this machine
402
Return Stroke pump
20T/H 1 9000 9000
Material contact parts SUS304, return stroke pump, suction 6m, motor power 4kw, hard alloy mechanical seal , ABB motor
 
Total
      9000  

CIP system
 
No.

Name

Spec
 
Qty.

Exw RMB

Subtotal

 Technical requirements
501
CIP system
1X2+0.6 1 39000 39000
Material SUS304, single layer storage tank, with 1pcs 1000L Acid tank, 1pcs 1000L alkali tank,1pcs 600L hot water tank, 1pcs distributing plate, 15T/H cleaning pump with ABB motor
 
Total
      39000  

chilled water system
 
No.

Name

Spec
 
Qty.

Exw RMB

Subtotal

 Technical requirements
601
Water chilling system

25000Kcal/H
1 136000 136000
1pcs Close type water cooled compressor, 10000L stainless steel chilled water tank, with automatic control cabinet,1pcs  circulation pump (Q235 cabinet,schneider electrical element), water out pump 1 pcs
 
total
      136000  

Others
 
No.

Name

Spec
 
Qty.

Exw RMB

Subtotal

 Technical requirements
701
Material for Process pipline
Φ38Φ51 1 105000 105000
Above processing machine pipe connection, valve and instrument in main workshop
702
Material for utility pipline
  1 52000 52000
utility pipline for steam, chilled water,tap water,compressed air in main workshop.
703
electricity system
  1 86000 86000
Main control cabinet, 
704
Freight cost
       
Quote later after confirm BOM list
705
installation charge
    52000 52000  
 
Total
      295000  
 
Grand Total
      965600  Цены указаны в ЮАНЯХ на момент запроса. 2009 год.